Hollywood Production Center III
Location: 225 E. Broadway, Glendale CA 91205
Completion date: January 2009
Building detail: 4-story, 76,000 SF commercial building
Project value: $9,000,000
Scope of work: Major Rehabilitation
Work Performed:
  • Structural and seismic retrofitting, core and shell upgrade with concrete shear wall system
  • Pre Construction Service and value engineering
  • Gut rehab demolition of the building components
  • Asbestos abatement
  • Redevelopment of exterior building facade
  • Installation of new HVAC, Electrical, Plumbing and Fire Life Safety systems
  • Installation of 1 new elevator
  • Commercial tenant improvement for 75,000 SF

TENTEN Wilshire
Location: 1010 W. Wilshire Boulevard,
Los Angeles, CA 90017
Completion date: June 2008
Building detail: 18-story steel and concrete with glass curtain wall over 2-level garage
Project value: $54,000,000
Scope of work: Adaptive Reuse Conversion and Major Rehabilitation
Work Performed:
  • Preconstruction services and value engineering
  • “Gut rehab” demolition of building components
  • Installation of framing and drywalls
  • Installation of 100% new HVAC, electrical, plumbing, and fire/life safety systems
  • Installation of new communication system
  • Structural and seismic retrofitting
  • Removal, replacement and improvement of    building façade
  • Installation of swimming pool and spa
  • Painting and flooring
  • Renovation of 2-level basement into 86-stall
  • Parking garage
  • Conversion of commercial office building into 227 live/work condominiums


Huntington Park Medical Plaza
Location: 2629 Clarendon Avenue,
Huntington Park, CA 90255
Completion date: August 2008
Building detail: 2-story, 23,000 SF commercial building with existing brick walls and concrete slab flooring (16,000 SF pre existing/7,000 SF addition)
Project value: $3,200,000
Scope of work: Major Rehabilitation 
Work Performed:
  • Preconstruction services and value engineering
  • Structural and seismic retrofitting, shell and core upgrade
  • Removal and replacement of HVAC and Fire Alarm systems, Plumbing
  • Metal stud framing
  • Painting and flooring
  • Commercial tenant improvements
  • New Elevators
  • New Bathrooms


Ocean Loft
Location: 111 S. Freeman Street,
Oceanside, CA 92054
Completion date: October 2007
Building detail: 6-story, 75,000 SF concrete commercial building
Project value: $10,500,000
Scope of work: Adaptive Reuse Conversion and Major Rehabilitation
Work Performed:
  • Preconstruction and value engineering
  • “Gut rehab” demolition of building components
  • Asbestos Abatement
  • Structural and seismic retrofitting, shell and core upgrade
  • Integration and new construction of 40,000 SF of building area
  • Installation of new Elevator, Mechanical, Electrical, Plumbing and Fire Life Safety systems
  • Redevelopment of alley and sidewalks
  • Conversion of commercial office building into 32 live/work condominiums and 3 commercial retail condominiums


Hollywood Production Center II
Location: 401 N. Brand Boulevard,
Glendale, CA 91203
Completion date: December 2006
Building detail: 10 and 7-story, 140,000 SF steel commercial buildings
Project value: $8,200,000
Scope of work: Major Rehabilitation
Work Performed:
  • Asbestos abatement
  • Remodel of exterior building façade
  • Providing preconstruction project design, and value engineering services
  • Gut rehab and demolition of building components
  • Installation of new elevator
  • Modernization of existing elevators, electrical, mechanical and plumbing systems
  • Tenant improvements for mixed use office/retail space


East
Los Angeles Dialyses Center
Location: 5830 E. Whittier Blvd.
Los Angeles CA 90022
Completion date: April 2006
Building detail: 2 Story Building 13,000 SF
Project value: $1,200,000
Scope of work:

Upgrade Shell and core
New Bathroom

Work Performed:
  • Tenant Improvement for dialyses center


Casa Bella
Location: 6900 Rita Avenue,
Huntington Park, CA 90255
Completion date: June 2004
Building detail: 15, 2-story wood frame town homes (Combination of 8 Market Rates and 7 affordable)
Project value: $6,000,000
Scope of work:

New Construction

Work Performed:
  • Pre Construction services and value engineering
  • Design/build construction services
  • Construction of whole project from A - Z


Hollywood Production Center I
Location: 1149 N. Gower Street, Los Angeles, CA 90038
Completion date: June 2004
Building detail: 2-story, 75,000 SF commercial building with existing brick walls and concrete slab flooring
Project value: $3,075,000
Scope of work:

Major Rehabilitation

Work Performed:
  • Preconstruction services and value engineering
  • Floor design
  • Metal stud framing
  • Removal and replacement of HVAC system
  • Installation of new elevator and emergency power backup system
  • Commercial tenant improvements


Zoe Building
Location: 2677 Zoe Avenue,
Huntington Park, CA 90255
Completion date: March 1999 (bldg. rehab.) &
2001 (garage constr.)
Building detail: 3-story commercial building and 3-level garage
Project value: $9,280,000
Scope of work:

Major Rehabilitation and New Construction

Work Performed:
  • Preconstruction services and value engineering
  • Project design and administration
  • Removal and replacement of HVAC and plumbing systems
  • Conversion of basement into commercial office space
  • Installation of new bathrooms
  • Painting and flooring
  • Construction of 3-level, 127-stall parking garage
  • Rehabilitation of 88,000 SF office building


Cartoon Network
Location: 300 N. 3rd Street,
Burbank, CA 91502
Completion date: June 1999
Building detail: 3-story, commercial building
Project value: $4,300,000
Scope of work:

Major Rehabilitation

Work Performed:
  • Pre-construction services and value engineering
  • Total gut rehab of the components of the building
  • Redevelopment of exterior building facade
  • Installation of new Elevator, HVAC, Electrical, and Fire Sprinkler systems
  • Structural and seismic retrofitting, concrete shear wall system
  • Installation of new bathrooms and windows
  • 44,000 SF of tenant improvements for Cartoon Network


127 S. Brand Blvd
Location: 127 N. Brand Boulevard,
Glendale, CA 91204
Completion date: 1998
Building detail: 4-story, 20,000 SF commercial building
Project value: $1,200,000
Scope of work:

Major Rehabilitation

Work Performed:
  • Design-built and value engineering services
  • Structural and seismic retrofitting, shell and core upgrades with concrete shear wall system
  • Installation of new Elevator, Electrical, and HVAC systems
  • Installation of new bathrooms
  • Commercial tenant improvements


Ventura Executive Office
Location: 701 E. Santa Clara Street,
Ventura, CA 93001
Completion date: February 1998
Building detail: 1-story commercial building
Project value: $1,200,000
Scope of work:

Building Renovation and Remodeling

Work Performed:
  • Design-built and value engineering services
  • Asbestos abatement
  • Conversion of 20,000 SF warehouse into executive office suites


2500 Wilshire Blvd
Location: 2500 Wilshire Boulevard,
Los Angeles, CA 90057
Completion date: November 1997
Building detail: 13 Story concrete structure office building
Project value: $7,000,000
Scope of work:

Shell & Core up grade

Work Performed:
  • 17,500 SF tenant improvement


3540 Wilshire
Location: 3540 Wilshire Boulevard,
Los Angeles, CA 90005
Completion date: 1996
Building detail: 13-story, 260,000 SF commercial building
Project value: $10,200,000
Scope of work:

Building Rehabilitation

Work Performed:
  • Removal and replacement of Fire Sprinkler systems
  • Commercial tenant improvements for 175,000 SF